Control high risk work across complex operations

Keep permits, isolations, handovers and contractor crews tied to the process safety barriers they depend on, on every shift.

Two technicians applying a lock and tag to a valve at a gas processing plant

The problem

Where control of work breaks down on live plant

Hydrocarbon sites run many permits at once, around equipment that is still pressurised. The gaps usually appear between people, not within one form.

Isolations out of sight

Isolation certificates sit apart from the permit, so an approver cannot easily confirm which points are locked, by whom and whether any are shared with another job.

Handover by memory

Suspended permits and live isolations pass between shifts verbally or on paper logs, and conditions attached to them are easy to lose.

Barriers on paper only

Bow tie studies name critical barriers, but the permit crew rarely sees which of them the job is touching or temporarily impairing.

One connected workflow

Planned maintenance with isolation and multiple approvers

A crew replaces a leaking control valve on a gas export line. Here is how the work stays under one record from planning to reinstatement.

Illustrative scenario. Every site configures its own steps, forms and approvers; this is not a customer case.

  1. Permit request

    Maintenance planner

    The job is raised against the tag number, with the planned window, the contractor crew and a reference to the process risk assessment for that line.

    RecordedScope, equipment tag, crew, linked assessment

  2. Isolation plan

    Isolation authority

    Valves, blinds and electrical points are listed on the isolation plan. Each point is applied, locked and verified in the field, with a zero-energy check.

    RecordedEach isolation point, who applied it, verification result

  3. Multi-party approval

    Area authority, operations, HSE

    The permit routes to each approver in turn. Each sees the isolation status, crew readiness and any barrier impairment before signing.

    RecordedEach approval, condition and timestamp

  4. Shift handover

    Outgoing and incoming supervisors

    The job runs into night shift. Live isolations, gas test results and open conditions are handed over and acknowledged by the incoming supervisor.

    RecordedHandover acknowledgement with open items

  5. Reinstatement and closeout

    Performing authority and operations

    Isolations are removed in order, the line is leak-tested and returned to operations, and the permit is closed with the work confirmed complete.

    RecordedDe-isolation sequence, test result, closeout sign-off

Applicable modules

The FirstEHS modules this work draws on

By role

What each person gets from it

Area authority

Sees every permit and isolation in the area before approving the next one, so interacting work is spotted early.

Isolation authority

Records each lock, blind and verification against the permit rather than a separate certificate book.

Operations supervisor

Receives a structured handover of suspended permits and live isolations at the start of shift.

Process safety engineer

Can see where live work touches a critical barrier and which changes are open against it.